January 5th, 2008

Half of the 12 strip lights installed and on.

Half of the 12 strip lights installed and on.

All of the 12 strip lights installed and on.

All of the 12 strip lights installed and on.

November 28th, 2007

DeWalt Saw

Outfeed table

Drill Press

Tools on outfeed table

Some rough wiring

Timer switch for exterior lights

Exterior lights

August 20th, 2007

South side's finished grading.

South side's downspout.

South side's downspout.

West side's finished grading

North side's finished grading

Shop with grading and gutters completed.

August 15th, 2007

North side's gutter

North side's gutter

North side's gutter

August 11th, 2007

View of South gutter.

View of South gutter.

View of South gutter.

August 3rd, 2007

View of completed East wall

View of completed East wall

View of completed North wall

July 20th, 2007

South wall's siding completed

South wall's siding completed

West wall's siding completed

July 16th, 2007

West wall's siding halfway done.

Shop with lighting

Soffit in progress. 1x6 and 1x8 installed.

June 6th, 2007

View up the second floor ladder

View of the second floor ladder

May 25th, 2007

Inside view of all four windows installed

Inside view of three of the installed windows

Outside view of all four windows installed

Installed second floor window

Installed second floor window

May 7th, 2007

Inside view of an installed wondow.

Outside view of installed window

Outside view of installed window

Electric panel installed by Hawkins Electric

Close up of electric panel

Power coming into the shop

Trench for birnging power to the shop

December 3rd, 2006

Alice working on the ridge vent

Completed South side

Completed North side

October 22nd, 2006

Installing shingles

Installing shingles

Installing shingles

Installing shingles

Installed shingles

Installing shingles

August 26th, 2006

Monty and I installing some trim.

Monty and I installing some trim.

A little helper exploring the ladder.

Finishing up a piece of trim.

Finishing up a piece of trim.

June 24th, 2006

Guest Photographer, Andrew.

Andrea and Alec helping out.

Installing roof sheathing, with Wendy on watch.

Roof sheathing

Alec helping with the roof sheathing.

Inside looking out

Roof sheathing

The view from my future office.

June 4th, 2006

View from above, the second row of sheathing intalled.

Me working on the sheathing.

Me again, working on the sheathing.

More of the sheathing installed.

More of the sheathing installed.

May 13th, 2006

Alice nailing up the Typar

Typar up and wrapped into the doorways

Installing some of the Typar

April 19th, 2006

March 11th, 2006

Dave on the job. We just hooked up the block and tackle on top of the ridge beam.

Close up of the "stud extensions". Since the rafter was offset to the inside of the buidling (don't know how it happened, but that's something else), I added these spacers to extend the studs, so that the sheathing had a level surface to attach to.

There I am, cutting wood.

And here is Joe, crawling into a hole.

Dave working on installing more of the spacers...

and more spacers.

Dave raising some sheathing with the block and tackle. We attached the block and tackle to a C-clamp. We then tightened the C-clamp onto the sheathing. I got the C-clamp idea from the book Working Alone, and it worked like a charm.

I also screwed on "third-hands" to just below where the sheathing panel would sit. Dave would raise the panel to the height of the "hands". While on the second floor, I would then guide the sheathing behind the "hands". I would then tack it in place.

The East side fully sheathed.

March 5th, 2006

Sheathing on the South Wall

Sheathing on the South Wall

February 20th, 2006

Framing for second floor window

Framing for second floor window

January 29th, 2006

Western gable walls studs... and bamboo.

January 8th, 2006

Finished Rafters

Finished Rafters

December 28, 2005

Installation of rafters

Installation of rafters

Installation of rafters

December 13, 2005

The shop tented in plastic. The little green things on the sides are the spring clamps.

December 10, 2005

The shop, covered in snow.

The second floor covered in snow. The 6 mil plastic did a great job protecting the decking.

Monty is marking the rafter spacing on the second half of the ridge beam. The framing you see standing is the temporary support holding the ridge beam in place.

I call this "Framing in Motion" :-) This is a closeup of the temporary support holding the ridge beam.

The entire ridge beam is up with temporary supports.

The entire ridge beam is up with temporary supports.

December 03, 2005

The last piece of decking glued and nailed.

Trim the decking to the joists.

The framing for the stairwell.

The decking covered with 6 mil plastic.

Novermber 12, 2005

Long joists connecting to the stairs.

Short joists connecting to the stairs.

Novermber 06, 2005

Alice nailing up a joist.

More of Alice

Novermber 05, 2005

Monty walking on walls, nailing joists.

Monty again

Some of the joists nailed to the top plate.

My head is really in this one. ;-)

The shop

October 9, 2005

East wall with sheathing

October 9, 2005

6 Yards of ¾ gravel

With 8 inches of rain in two days, the slab was a little wet. I think I might scrap the whole workshop and make a hockey rink instead ;-)

Gravel in the trench

The remains of the gravel pile

Dermott helping to fill the trench.

September 24, 2005

Judy

Bryan

Bryan and Judy. Awwhhh...

The crew and the first part of the wall up

Alice with the entire wall

September 18, 2005

Bill and Joe cutting... something.

First half of the North wall.

Bill, Scott and Joe getting ready to lift the second half of the North wall.

Bill and I putting on the top plate.

The entire North wall up.

Three down one to go.

September 17, 2005

My Mom, niece Hannah and I.

Alice, Mom, and neighbor Johnny lifting a wall section.

My Mom and niece Hannah marking of stud locations.

Hannah staring at the trees.

Raising the wall with Alice, my nephew Dyland, and Mom.

Raising the wall with Alice, my nephew Dyland, and Mom.

Teaching the youngin's.

Nailing up a frame.

Sister Lauren and Alice framing.

September 13, 2005

South Wall with extra braces added.

September 10, 2005

Jon, Monty and I working on the first wall section.

Jon, Monty and I working on the first wall section.

Jon working on the first wall section.

Jon, Monty and I working on the first wall section.

The finished South wall.

The finished South wall.

The finished South wall.

July 04, 2005

Pilot hole for the anchors

Foundation with the sill sealer in place

Sill Plate in place with some anchors working.

A shot of the anchors I am using to attach the sill plate.

Sill sealer along the west foundation wall

June 18, 2005

Trench dug with fillter fabric and drain pipe.

Trench partially covered with gravel.

June 14, 2005

That's me grinding away on the rebar.

A shot of the incomplete drainage trench

The poured slab

June 6, 2005

Concrete truck in my neighbor's driveway.

A worker hauling concrete from truck to slab.

June 1, 2005

Mesh and rebar ready for the pour.

Mesh and rebar ready for the pour.

Mesh and rebar ready for the pour.

May 20, 2005

Matamoros Construction putting down stone.

Matamoros Construction putting down stone.

May 19, 2005

Another course on the block wall.

More block in place.

More block.

May 18, 2005

May 17, 2005

Sandro and his crew at work.

Sandro and his crew at work.

Sandro and his crew at work.

Block wall being built.

Block wall being built.

Block wall being built.

Pile o' sand.

The construction site.

May 16, 2005

Prep work for the slab.

Prep work for the slab.

Prep work for the slab.

March 19, 2005

Water in the South West corner of the footing trench.

Water in the North West corner of the footing trench.

Water in the South West corner of the footing trench.

End of shovel to show how much water was in the trench.

My second attempt at covering the foundation with plastic.

My second attempt at covering the foundation with plastic.

February 19, 2005

2005.02.19 - A row of doors from Second Chance

A row of doors from Second Chance

2005.02.19 - Stacks of flooring from Second Chance

Stacks of flooring from Second Chance

2005.02.19 - The footer trench covered in plastic

The footer trench covered in plastic

2005.02.19 - The footer trench covered in plastic

The footer trench covered in plastic

December 3, 2004

2004.12.03

Materials on People's truck

2004.12.03

Materials on People's truck

2004.12.03

First floor materials

2004.12.03

First floor materials

2004.12.03

Materials stacked and wrapped

2004.12.03

Materials stacked and wrapped

2004.12.03

Rebar in foundation footings

2004.12.03

Rebar in foundation footings

November 23, 2004

2004.11.23 Foundation

Foundation: Footing Excavation

2004.11.23 Foundation

Foundation: Footing Excavation

2004.11.23 Foundation

Foundation: Footing Excavation

2004.11.23 Foundation

Foundation: Footing Excavation

2004.11.23 Foundation

Foundation: Footing Excavation

November 20, 2004

2004.11.20 Sawhorse

Sawhorse

2004.11.20 Sawhorses Stacked

Sawhorses stacked

November 15, 2004

2004.11.15 Port-a-Potty

Port-a-potty

2004.11.15 Port-a-Potty

Port-a-potty

October 23, 2004
2004.10.23

Layout lines of workshop

2004.10.23

Close-up of Northeast corner stake.

August 31, 2004

2004.08.31

Before construction, looking at the South West corner of the plot.

2004.08.31

Before construction, looking at the North West corner of the plot.

2004.08.31

Before construction, looking Eastward at the house.